PROJECT INFORMATION

24,000 SF

Completed: 2010

Adaptive Reuse

VIP Services

Design-Build

Project Team

Architect: VIP Architectural Associates

Construction: VIP Structures

MEP Engineer: IPD Engineering

Established in 1927, the CNY Community Foundation was looking to relocate their operations into the historic University Club Building, located in the middle of Syracuse’s Downtown area, to continue supporting the growth of charitable endowments for the betterment of the region through local philanthropy.
VIP’s integrated team of architects, engineers and construction professionals worked collaboratively, utilizing a design-build/bridging method to provide a fast-track construction project, to transform this iconic building.

Overlapping design and construction allowed our team to meet the fast-track schedule. During the pre-planning stage our team documented the existing building conditions and historical features to determine the most cost-effective options, thoughtfully considering associated life-cycle cost and occupancy comfort. The result of these efforts led to a LEED certified project.

Related Projects

Food Bank of Central New York

Warehouse/Distribution Facility Renovation & Addition, Syracuse, NY

The Post Apartments

Adaptive Reuse Apartments, Syracuse, NY
VIP Structures - 50 Years of Design-Build

VIP Structures Headquarters

Adaptive Reuse Office, Syracuse, NY
Exterior of The Post mixed-use adaptive reuse building in downtown Syracuse, NY by VIP Structures

The Post Development Offices

Office and Industrial/Flex Mixed-Use, Syracuse, NY